CURRENT PROJECTS

16th St. NW Bus  (DCKA-2020-C-0046) - Washington DC

 

Agency: DDOT The purpose of the 16th Street NW Bus Lanes Project is to improve the performance and reliability of bus routes on 16th Street NW between Arkansas Avenue and H Street. The project will include peak period/peak direction bus lanes, transit signal priority, bus queue jumps, and improved bus stops (ADA, bus zone expansions, additional shelters) and pedestrian improvements

 

 

Kennedy Center Pedestrian/Bicycle Trail - Washington DC

 

Agency: FHWA Project starts north of inlet bridge along Ohio Drive and ends along Rock Creek and Potomac Parkway at Virginia Avenue NW. Rock Creek Park Trail will be widened from 8 feet to 10-14 feet and there will be spot pavement patches and mill and overlay on Rock Creek Parkway. Work items will include asphalt concrete pavement mill and overlay, full-depth asphalt concrete pavement patching, signing, pavement markings, lighting and other miscellaneous work

 

PAST PROJECTS

 

Bike Station - Washington DC

 

Agency DDOT (Copmleted 2009)  Grunley & MPC constructed the Union Station Bicycle Transit Center, a 1,600 SF bicycle garage which offers secure storage for 130 bikes as well as a changing room, small bike shop and bike rental area. This architecturally signicant design is the first structure of its kind locally. The facility sits right above a Metro tunnel. To accommodate the tunnel, the 150' x 30' Bicycle Tran­sit Center has a shallow, horizontal foundation. Echoing a bicycle wheel’s elegance and efficiency, arched steel tubes are stabilized by a series of “spokes” or stainless steel tie rods in order to lighten up the structure. An energy efficient “skin” optimizes transparency while further moderating temperature. Further minimizing heat gain, denser graduated ceramic frit low-e glazing, opens up progressively to views of the plaza level

 

Lincoln Memorial - Washington DC

 

Agency : FHWA/NPS (Completed 2007) Designed to honor the 16th president of the United States of America, Abraham Lincoln, the Lincoln Memorial was constructed starting in 1914, and completed and dedicated in 1922. Architect Henry Bacon designed the memorial to resemble a classical Greek temple, with 36 fluted Doric columns encircling the exterior, and a main chamber for the sculpture of President Lincoln. MPC performed all site work on this project.

 

 

Rosewick Rd Median Opening - Charles County ,MD

 

Agency: Charles County Government (Completed...2011) The project added a curbed median on Rosewick Rd also upgraded storm drain, sidewalk, milling & overlay and road markings.

 

 

WMATA bus Grarage - Suitland MD

 

Agency: WMATA (Completed 2016) Our team provided support to Hensel Phelps on installing all porous paving on this project. 

 

 

Arlington National Cemetery - Ord & Weitzel Drive Arlington ,VA

 

Agency : USACE (Completed 2018) MPC reconstructed Lincoln, L'Enfant, Mitchell, and Ord & WeitzelDrives. The work included grading, asphalt pavement, aggregate base,drainage improvements, curb and gutter, utility relocations and other related work. The existing pavement and curbs have been  removed and new curb and gutter set in asimilar offset and elevation as indicated on the cross sections. Utility relocations included relocating existing yard hydrants
behind new curb and gutter in addition to installing new drinking fountains.

 

 

Reconstruction of E. Capitol St. btw 19th St & 22nd St. - Washington DC

 

Agency: DDOT (Completed 2010) The work included grading, asphalt pavement, aggregate base,drainage improvements, curb and gutter, utility relocations and streetlight & traffic upgrades. 

 

 

Nannie Helen Burrows Avenue - Washington DC

 

Agency DDOT (Completed 2013) The work included grading, asphalt pavement, aggregate base,drainage improvements, curb and gutter, utility relocations and streetlight & traffic upgrades. 

 

 

Arlington National Cemetery - Pershing Road Repairs Arlington,VA

 

Agency : USACE (Completed 2020) The work included grading, asphalt pavement, aggregate base,drainage improvements, curb and gutter, utility relocations and other related work. The existing pavement and curbs have been  removed and new curb and gutter set in asimilar offset and elevation as indicated on the cross sections. Utility relocations included relocating existing yard hydrantsbehind new curb and gutter in addition to installing new drinking fountains.

 

 

Virginia Avenue Tunnel - Washington DC

 

Agency CSX/DDOT (Completed 2019) MPC worked for CLARK Construction on this award wining project completing underground storm/sewer and electric also site work and paving.

 

 

Clara Barton Parkway - Washington DC / Maryland

 

Agency: FHWA (Completed 2020) The work may included correcting drainage deficiencies, replacing roadway signs and pavement markings, and repairing retaining walls. The roads included on this project were Clara Barton Memorial Parkway from Canal Road to MacArthur Blvd, Cabin John Access Road and Ramps, MacArthur Blvd Access Ramps, Parkway Ramps at Cabin John Access Road, at Carderock and Naval Research Center, and Carderock Access Road and Ramps

 

 